I think we have discussed this before, but we need FUTURE to be able to plot/output the instantaneous oil production potential.
Our understanding of ‘potential’ is simply the unconstrained oil production at a given point in time, considering the production history up to that time. This is different from simply running a model fully unconstrained. Only the oil potential is of interest to us.
Please provide an estimate of the cost and time required to implement this feature.
-----------------------------------------------------------------------------------------------------------------------------------------------------
This is already done in V4 – create a reporting group and select the option
“Report Potential Rates”